Cement silo filling at a major readymixed concrete producer was causing concern. The serious consequences of silo overfill and subsequent safety hazards to protect the environment were a major issue. Traditional level switches required silo roof visits for testing, creating additional risks for staff.
Monitor SafePoint
Failsafe operation
Client decided to replace all traditional level switches with SafePoint in 2008. As a result, no overfills have occurred and safer operator procedures have been introduced.